Below the Ground
Process:
- Select a site with any soil type
- High water table
- Rocky soil
- Landfills
- Flood prone land
- Cut and fill where necessary
to achieve a 3% gradient, suitable up to 6% gradient.
Install drainage
- Construct strip footings to engineer's
specifications
- Backfill between footings using
crushed granite or suitable aggregate
- Align
cells in a honeycomb formation (Patent awarded)
- End and side panels added
Seal all joints
- Place on lids (3 pieces)
- Cover with 50mm coarse river
sand and 250mm of sandy loam topsoil
- Landscape surrounding area
- Turf
- Install identification marker
- Forms a grove of preformed gravesites
Download the Video Presentation
For best results, right click your choice of movie, and choose 'Save target As' and save it to your computer.
If you cannot play any of these movie files, you might need to update your Windows Media Player.
Modern Burial System.
Telephone: +61 7 4936 8426
Facsimile: +61 7 4922 6908
Email: info@modernburialsystem.com
PO Box 336
Rockhampton Queensland Australia 4700
Content © 2001 Modern Burial System.
A Rockhampton City Council concept, implemented in the Rockhampton Memorial Gardens, Queensland, Australia.
Design © 2001 Almost Anything Desktop Publishing.