Below the Ground

Process:

  1. Select a site with any soil type
    • High water table
    • Rocky soil
    • Landfills
    • Flood prone land
  2. Cut and fill where necessary to achieve a 3% gradient, suitable up to 6% gradient.
  3. Install drainage
  4. Construct strip footings to engineer's specifications
  5. Backfill between footings using crushed granite or suitable aggregate
  6. Align cells in a honeycomb formation (Patent awarded)
  7. End and side panels added
  8. Seal all joints
  9. Place on lids (3 pieces)
  10. Cover with 50mm coarse river sand and 250mm of sandy loam topsoil
  11. Landscape surrounding area
  12. Turf
  13. Install identification marker
  14. Forms a grove of preformed gravesites

Download the Video Presentation

For best results, right click your choice of movie, and choose 'Save target As' and save it to your computer.

View the Video
Windows Media for High Speed Connections

4.93 Mb

View the Video
Windows Media for Medium Speed Connections

2.51 Mb

View the Video
Windows Media for 56K Modem Connections

1.46 Mb

If you cannot play any of these movie files, you might need to update your Windows Media Player.

Modern Burial System.
Telephone: +61 7 4936 8426
Facsimile: +61 7 4922 6908
Email: info@modernburialsystem.com
PO Box 336
Rockhampton Queensland Australia 4700

Content © 2001 Modern Burial System.
A Rockhampton City Council concept, implemented in the Rockhampton Memorial Gardens, Queensland, Australia.

Design © 2001 Almost Anything Desktop Publishing.

Introduction
Below the Ground
Specifications
Above the Ground
Accessories
Contact