Above the Ground
Process
Identify
correct gravesite from identification marker
- A mobile gantry hoist (Patent
Pending USA) is attached to a small tractor, and reversed up to gravesite
- Steel template is laid out over
gravesite to ensure no encroachment an neighbouring gravesites
- A custom fabricated power spade
is used to cut the turf and top soil down to lid level
The template is used to locate the three lifting points, turf and
topsoil is removed from the three locations
- The mobile gantry is reversed
over the crypt. The three belt winches are tensioned by hand
- The covering turf, soil and lid
are lifted free of the crypt opening, and is moved out of sight
The
gravesite is traditional, dignified and asthetically pleasing
- After mourning party has left,
soil is placed over coffin using a mobile soil hopper
- Lid installation is completed
within minutes of the mourning party leaving
Download the Video Presentation
For best results, right click your choice of movie, and choose 'Save target As' and save it to your computer.
If you cannot play any of these movie files, you might need to update your Windows Media Player.
Modern Burial System.
Telephone: +61 7 4936 8426
Facsimile: +61 7 4922 6908
Email: info@modernburialsystem.com
PO Box 336
Rockhampton Queensland Australia 4700
Content © 2001 Modern Burial System.
A Rockhampton City Council concept, implemented in the Rockhampton Memorial Gardens, Queensland, Australia.
Design © 2001 Almost Anything Desktop Publishing.